1 | TOTAL PROJECT COST FOR THE YEAR 2019-2020 (Upto December 2020) | Rs. 10,350,142.87 |
2 | TOTAL PROJECT COST FOR THE YEAR 2019-2020 | Rs. 27,365,561.77 |
3 | TOTAL PROJECT COST FOR THE YEAR 2018-2019 | Rs. 109,513,708.69 |
4 | TOTAL PROJECT COST FOR THE YEAR 2017-2018 | Rs. 140649242.00 |
5 | TOTAL PROJECT COST FOR THE YEAR 2016-2017 | Rs. 140860133.00 |
6 | TOTAL PROJECT COST FOR THE YEAR 2015 - 2016 | Rs. 91070191.00 |
7 | TOTAL PROJECT COST FOR THE YEAR 2014 - 2015 | Rs. 161340529.00 |
8 | TOTAL PROJECT COST FOR THE YEAR 2013 - 2014 | Rs. 45846741.00 |
9 | TOTAL PROJECT COST FOR THE YEAR 2012 - 2013 | Rs. 28201126.00 |
10 | TOTAL PROJECT COST FOR THE YEAR 2011-2012 | Rs. 13305693.00 |
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Community & Pay and Use Toilets
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of 2 nos Community Toilets at Ward No. 11 (Under Burdwan Municipality, Burdwan) | 184978.00 |
2 | Construction of 2 nos Community Toilets at Ward No. 12 (Under Burdwan Municipality, Burdwan) | 184978.00 |
3 | Construction of 2 nos Community Toilets at Ward No. 13 (Under Burdwan Municipality, Burdwan) | 184978.00 |
4 | Construction of 2 nos Community Toilets at Ward No. 19 (Under Burdwan Municipality, Burdwan) | 184978.00 |
5 | Construction of Pay and Use Toilet (Sulabh) at Burdwan Collectorate Complex, Burdwan | 703604.00 |
Total | 1443516.00 |
Construction of Concrete Roads
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete Road at Ward No. 25 (Under Burdwan Municipality, Burdwan) | 1041892.00 |
2 | Construction of Concrete Road at Saratpally, Ward No. 1 (including drain) under Burdwan Municipality, Burdwan. | 1573123.00 |
3 | Construction of Concrete Road at Ward No. 16, infront of Dr. SankahSubhraGhosh near ChotonilpurPirtala, Under Burdwan Municipality, Burdwan. | 510718.00 |
4 | Construction of Concrete Road from AbulBasar House to LaijulHaque House adjacent to BahirSarbamangala Road at Ward No. 2 under Burdwan Municipality, Burdwan. | 358077.00 |
5 | Construction of concrete road at KalipukurBhatchala peon para road at Ward No. 35 under Burdwan Municipality, Burdwan. | 310336.00 |
6 | Construction of Concrete Road at BaburbagLichutala (Beltala) road at Ward No. 27 under Burdwan Municipality. | 596778.00 |
7 | Concrete road from Gosaibari to Health Centre at Berh (via ParamanikDurgabari) at Ward No. 17 under Burdwan Municipality, Burdwan. | 933838.00 |
Total | 5324762.00 |
Beautification Project
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Beautification of pond at Circuit House, Burdwan | 2766342.00 |
Total | 2766342.00 |
Construction of Drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Consturciton of drain in the area of Khargeswar, Kanchannagar at Ward No. 24 from BadalSikdar's House to SumantaDas's House under Burdwan Municipality, Burdwan. | 1363456.00 |
Total | 1363456.00 |
Construction of Boundary Wall
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Boundary Wall at Lahar, Court Compound, Burdwan. | 949512.00 |
2 | Boundary wall with grill fencing matching with existing fencing at Collectorate Complex, Court Compound, Burdwan. | 168422.00 |
Total | 1117934.00 |
Renovation of Guard Wall
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of Guardwall of Pond adjacent to playground at Raj College, Burdwan. | 1289683.00 |
Total | 1289683.00 |
TOTAL PROJECT COST FOR THE YEAR 2011-2012 :- | 13305693.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Community & Pay & Use Toilets
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of 2 nos Community Toilets at Ward No. 29, under Burdwna Municipality | 184978.00 |
2 | Construction of 2 nosCommunity Toilets at Ward No. 23, under Burdwan Municipality, Burdwan | 184978.00 |
3 | Construction of 2 nosCommunity Toilets at Ward No. 31, under Burdwan Municipality, Burdwan | 184978.00 |
4 | Construction of 2 nosCommunity Toilets at Ward No. 24, under Burdwan Municipality, Burdwan | 184978.00 |
5 | Construction of 2 nos Community Toilets, at Ward No. 33, under Burdwan Municipality, Burdwan | 168784.00 |
6 | Construction of Pay & Use Toilets at Burdwan Medical College & Hospital Campus, Burdwan | 703604.00 |
Total | 1612300.00 |
Concrete Pavements & Roads
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete pavement in the area of BelpukurKanchan Nagar, within the Burdwan Municipal Area, Burdwan | 985264.00 |
2 | Construction of Concrete pavement in the area of TikarhatHajidangaMohalla (Opposite to Aluminium Factory) within the Burdwan Municipal Area, Burdwan | 714470.00 |
3 | Construction of Concrete pavement in the area of MohanbagTejganj, Burdwan | 985264.00 |
4 | Construction of Concrete pavement in the area of Gosaipara under Baikunthapur - I GP, Burdwan | 530494.00 |
5 | Construction of Concrete pavement in the area of Bidhanpally, at Ward no 11, within Burdwan Municipal Area, Burdwan | 140949.00 |
6 | Construction of Concrete pavement in the area of Niveditapally, under the Burdwan Planning Area, Burdwan | 1308225.00 |
7 | Construction of concrete pavement in the area of DVC North Bandh, within the Burdwan Municipal Area, Burdwan | 985264.00 |
Total | 5649930.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation and Widening of Bituminous approach road adjacent to Railway Over Bridge (Near Mehadibagan), Burdwan | 2334070.00 |
2 | Construction of Bituminous Road in the area of Gopalnagar, Baikunthpur-II GP, Burdwan | 2302453.00 |
Total | 4636523.00 |
Beautification of park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Beautification of park at Sadhanpur, Burdwan | 335454.00 |
Total | 335454.00 |
Water Supply Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Sinking of 8 nos. (2 nos per ward) Cylinder Tubewells at Ward No. 3,7, 28 and 30 under Burdwan Municipality, Burdwan | 405239.00 |
2 | Sinking of 2nd Deep Tubewell (under Harinarayanpur - III) Water Supply Scheme, under Burdwan - I P.S, Burdwan | 185893.00 |
3 | Sinking of 4 nos. Cylinder Tubewells at Ward No. 26 under Burdwan Municipality, Burdwan | 195888.00 |
4 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 10 under Burdwan Municipality, Burdwan | 97944.00 |
5 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 13 under Burdwan Municipality, Burdwan | 97944.00 |
6 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 12 under Burdwan Municipality, Burdwan | 97944.00 |
7 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 24 under Burdwan Municipality, Burdwan | 97944.00 |
8 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 23 under Burdwan Municipality, Burdwan | 97944.00 |
9 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 25 under Burdwan Municipality, Burdwan | 97944.00 |
10 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 29 under Burdwan Municipality, Burdwan | 97944.00 |
11 | Sinking of 2 nos. Cylinder Tubewells at Ward No. 8 under Burdwan Municipality, Burdwan | 97944.00 |
Total | 1570572.00 |
Construction of Moorum Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Moorum Road from G.T. Road to Central School, Goda, Burdwan | 897228.00 |
Total | 897228.00 |
Construction of Drains
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Drain in the area of Central Park, at Ward No. 12, within Burdwan Municipal Area, Burdwan | 3450026.00 |
2 | Construction of Drain from Saraitikar to Sapjola under Burdwan Planning Area, Burdwan | 2780193.00 |
Total | 6230219.00 |
Renovation Works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Emergency works of one side colour washing with allied works at BDA Guest House, Badamtala, under Burdwan Municipality | 54229.00 |
2 | Renovation of Chat Puja Ghat at Banka River (Ward No. 22) adjacent to Kalpataru Math, Alamganj, Burdwan | 1675417.00 |
Total | 1729646.00 |
Installation of Statue
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | EInstallation of a life size bronze statue of Rabindra Nath Tagore at Golapbag, Burdwan Burdwan University Campus. | 1000000.00 |
Total | 1000000.00 |
Construction of Boundary Wall
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Barbed Wire Fencing around Commercial Complex & IT Hub at Bamchandaipur, Burdwan | 1384615.00 |
2 | Maintenance, Repairing works, Boundary Wall, Fencing and Other works at Radharani Stadium Burdwan | 983569.00 |
Total | 2368184.00 |
Construction of Box Slab Culvert
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Box Slab Culvert and Guard Post at the approch road of Railway Over Bridge near Mehidibagan, Burdwan | 1178836.00 |
Total | 1178836.00 |
Besides, being the Executing Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Construction of Public Toilet
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Public Toilet near Taxi Stand (Opposite to Spandan Complex), Burdwan | 992234.00 |
Total | 992234.00 |
TOTAL PROJECT COST FOR THE YEAR 2012 - 2013 :- | 28201126.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Concrete pavements
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete pavement in the area of BhatchalaMasjidtala at Ward No. 18, within the Burdwan Municipal Area, Burdwan | 214172.00 |
2 | Construction of Concrete pavement at the west side of Yashoria Rice Mill from SankharipukurGolahat Post Office to DinabandhuSuni's House at Ward No. 18, under Burdwan Municipal Area, Burdwan | 293074.00 |
3 | Construction of Concrete pavement in the area of BinoynagarNarandighi, under the Burdwan Planning Area, Burdwan | 691806.00 |
4 | Construction of Concrete pavement at RanidighiUttarpar, at Ward No. 12, within the Burdwan Municipal area , Burdwan | 511278.00 |
5 | Construction of Concrete pavement at LakurdiMaheshgali, at Ward No.25, within the Burdwan Municipal Area, Burdwan | 1108386.00 |
6 | Construction of Concrete pavement at MohanbagPurbapara at Belkash GP, within the Burdwan Planning Area, Burdwan | 1534759.00 |
7 | Construction of Concrete road in the area of Vidysagar pally at Rayan - I G.P, under Burdwan Planning Area, Burdwan | 1113738.00 |
Total | 5467213.00 |
Repairing and Rehabilitation of Bridge
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Repairing and Rehabilitation of Old Banka Bridge, at Alamganj, Burdwan | 8593188.00 |
Total | 8593188.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bituminous Road from Saraitikar to Chandel (2nd Phase), under Burdwan Planning Area, Burdwan | 4262691.00 |
2 | Construction of Bituminous Road at Krishnapur Village from High School to SishuSiksha Kendra, under Burdwan Planning Area, Burdwan | 4262691.00 |
3 | Construction of Bituminous road from Udaypally to Belkash High School (from 0.000 k.m to 1.000 k.m) within the Burdwan Planning Area, Burdwan | 3543538.00 |
4 | Construction of Bituminous road from Udaypally to Belkash High School (from 1000.001 k.m to 2000.000 k.m) within the Burdwan Planning Area, Burdwan | 3543538.00 |
5 | Construction of Bituminous road from Udaypally to Belkash High School (from 2000.001 k.m to 3000.00 k.m) within the Burdwan Planning Area, Burdwan | 3543538.00 |
6 | Construction of Bituminous road from Udaypally to Belkash High School ( from 3000.001 k.m to 4000.000 k.m) within the Burdwan Planning Area, Burdwan | 3543538.00 |
7 | Urgent repair works for Bituminous road of Railway Over Bridge, near Mehandibagan, Burdwan | 202986.00 |
Total | 22902520.00 |
Construction of Park & Development of Playground
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Park in the area of Bankar Par Colony (Ward no. 25), R.B Chatterjee Road, Lakurdi, Burdwan | 279281.00 |
2 | Renovation of BhatchalaBakar Math, at Ward No. 18, within the Burdwan Municipality, Burdwan | 1953757.00 |
3 | Beautification of RabindraSishuUdyan at 4 no. Shankaripukurar, Ward No. 15, within the Burdwan Municipal Area, Burdwan | 1890410.00 |
Total | 4123448.00 |
Water Supply Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Sinking of 4nos Cylinder Tubewell at Ward No. 27, within Burdwan Municipal Area, Burdwan | 195888.00 |
2 | Sinking of 4nos Cylinder Tubewell at Ward no 3, within Burdwan Municipal Area, Burdwan | 195888.00 |
3 | Sinking of 4nos Cylinder Tubewell at Ward no 4 , within Burdwan Municipal Area, Burdwan | 195888.00 |
4 | Sinking of 4 nos Cylinder Tubewell at Ward No. 31, within Burdwan Municipal Area, Burdwan | 195888.00 |
5 | Sinking of 2nos Cylinder Tubewell at Ward no. 5, within Burdwan Municipal Area, Burdwan | 97944.00 |
6 | Sinking of 2 nos Cylinder Tubewell at Ward No. 18, within Burdwan Municipal Area, Burdwan | 97944.00 |
7 | Sinking of 2 nos Cylinder Tubewell at Ward no 10 & 11 , within Burdwan Municipal Area, Burdwan | 97944.00 |
8 | Drinking water facilities (with sinking of submersible pump) in the campus of Burdwan Medical College Hospital, Burdwan | 204870.00 |
9 | Supply of piped water at Silepara at Burdwan - II PS, under the Burdwan Planning Area, Burdwan | 998118.00 |
Total | 2280372.00 |
Besides, being the Executive Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Illumination Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | High Mast Light at Curzon Gate under Burdwan Municipality | 500000.00 |
2 | High Mast Light at Golap Bag More, under Burdwan Municipality | 330000.00 |
3 | High Mast Light at Laxmipur Math College More, under Burdwan Municipality | 330000.00 |
4 | High Mast Light at Nurse Quarter More, Ward No. 27, under Burdwan Municipality | 330000.00 |
5 | High Mast Light at Parcus Road More on G.T. Road, under Burdwan Municipality | 330000.00 |
6 | High Mast Light at Tinkonia Bus Stand on G.T. Road, under Burdwan Municipality. | 330000.00 |
7 | High Mast Light at Bajepratappur More, on Katwa Road, under the Burdwan Municipality | 330000.00 |
Total | 2480000.00 |
TOTAL PROJECT COST FOR THE YEAR 2013 - 2014 :- | 45846741.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Development of Mandela Park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Development of Mandela Park including provision of parking area near Bijoy Toran, Burdwan | 64904000.00 |
Total | 64904000.00 |
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete Road at MohanbagDakshinpara, Saradapally, Tejganj, within the Burdwan Planning Area, Burdwan | 3467547.00 |
2 | Construction of Concrete pavement in front of SujitKoner's House at Rayan-I G.P, within the Burdwan Planninga Area, Burdwan | 463825.00 |
3 | Construction of Concrete pavement at Padma PukurBandher Par at Ward No. 23, under Burdwan Municipality, Burdwan | 1163372.00 |
4 | Construction of Concrete pavement at Kanchan Nagar Bandherpar, at Ward No. 24, under Burdwan Municipality, Burdwan | 786267.00 |
5 | Construction of Concrete pavement at AnjirbagMatirbag at Ward No. 23 under Burdwan Municipality , Burdwan | 1000442.00 |
6 | Construction of Concrete pavement from Canal to Alludding's House at Malirbagan, within the Burdwan Planning Area, Burdwan | 1458979.00 |
7 | Construction of Concrete pavement in the area of Malirbagan, within the Burdwan Planning Area, Burdwan | 1924618.00 |
8 | Construction of Concrete pavement at Nari Das Para from SSK to SupriyaMallick's House, within the Burdwan Planning Area, Burdwan | 2746460.00 |
9 | Construction of Concrete pavement from Culvert to Main Road via Munshi Para at Saraitikar Village, within the Burdwan Planning Area, Burdwan | 964864.00 |
10 | Construction of Concrete Pavement at Sukantapally (2nd phase), within the Burdwan Planning Area, Burdwan. | 3737541.00 |
11 | Construction of Concrete pavement in the area of Votar Par Village, within the Burdwan Planning Area, Burdwan | 4328617.00 |
12 | Construction of concrete pavement at Rayan Village under the Burdwan Planning Area, Burdwan | 6261413.00 |
13 | Construction of Concrete pavement from BijayramKalitala to Linedhar under Saraitikar G.P, Burdwan | 4128887.00 |
14 | Construction of Concrete Pavement at Niveditapally, under the Burdwan Planning Area, Burdwan | 2339118.00 |
Total | 34771950.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bituminous Road at Nerodighi Village, under the Burdwan Planning Area, Burdwan | 6160313.00 |
2 | Construction of Bituminous Road at Netaji Nagar, under the BurdwanPlanning area, Burdwan | 1992629.00 |
3 | Construction of Bituminous Road from Jamtala Bus stoppage to Amirpur, under the BurdwanPlanning area, Burdwan | 8573559.00 |
4 | Construction of Bituminous Road from NH-2 to Belkash, via Nala (1st phase) (from 0.000 k.m to 2.000 k.m) under the BurdwanPlanning Area, Burdwan | 5310354.00 |
5 | Construction of Bituminous road at ShibpurDighirpar under the Burdwan Planning Area, Burdwan. | 6221292.00 |
6 | Construction of Bituminous road from Katwa road to Ali House at Votarpar Village under the Burdwan Planning Area, Burdwan | 2487001.00 |
7 | Renovation of Bituminous Road from LakurdiKalitala to Biritikuri Village, under the Burdwan Planning Area, Burdwan | 1706007.00 |
Total | 32451155.00 |
Senior Citizens Parks Abasarika
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Park at KankaleswariKalibari premises, Kanchan Nagar, under Burdwan Planning Area, Burdwan | 3801753.00 |
a) | Supplying, fitting, fixing, foundation and erection of a fountain in the pond of 'Abasarika' at KankaleswariKalibari premises, Kanchan Nagar, Burdwan | 442000.00 |
b) | Installation of submersible pump at 'Abasarika' (KankaleswariKalibari premises) Kanchan Nagar, Burdwan | 216205.00 |
2 | Construction of Park named 'Abasarika' at KankaleswariKalibari premises (2nd phase), Kanchannagar, under the Burdwan Planning Area, Burdwan | 7441887.00 |
Total | 11901845.00 |
Construction of wheel guard and footpath along both sides over old Banka Bridge at Alamganj
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of wheel guard and footpath along the left side from AlamganjPhari over Old Bankda Bridge at Alamganj, under Burdwan Municipality, Burdwan | 883404.00 |
Total | 883404.00 |
Development of Playground
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of football ground at Tejganj School Para Near SidhuKanu Club under Belkash G.P, Burdwan | 3664017.00 |
Total | 3664017.00 |
Construction of Pucca Drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Pucca Drain in the area of GossainparaPirtala, near Agriculture Firm, under the Burdwan Planning Area, Burdwan | 1111895.00 |
Total | 1111895.00 |
Deposite Work
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of R.C.C. Road beside the New Administrative bUilding of the office of the District Magistrate, Burdwan | 1226547.00 |
Total | 1226547.00 |
Besides, being the Executive Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Construction of Public Toilet
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Pay & Use Toilet at College More (Laxmipur Math) under Burdwan Municipality ,Burdwan | 922858.00 |
2 | Construction of Pay & Use Toilet complex near Golapbag More under Burdwan Municipality, Burdwan | 922858.00 |
Total | 1845716.00 |
Illumination Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | High Mast Light near Rail Station, under Burdwan Municipality, Burdwan | 330000.00 |
2 | High Mast Light at ChhinanmastaKalibari, Ward No. 10, under the Burdwan Municipality | 330000.00 |
3 | High Mast Light near Sarbamangala Bari, Ward No. 20, under the Burdwan Municipality | 330000.00 |
4 | High Mast Light at Kabarsthan, Ward No. 19, under the Burdwan Municipality | 330000.00 |
5 | High Mast Light at Tentultala Bazar, Ward No. 31, under the Burdwan Municipality | 330000.00 |
6 | High Mast Light at Khagra Gar More, under the Burdwan Municipality | 330000.00 |
7 | High Mast Light at Police Line (1) | 330000.00 |
8 | High Mast Light at Police Line (2) | 330000.00 |
9 | High Mast Light at Police Line (3) | 330000.00 |
10 | High Mast Light at Police Line (4) | 330000.00 |
11 | High Mast Light in between University 1st Gate and 2nd Gate, under the Burdwan Municipality | 330000.00 |
12 | High Mast Light at Bidhan Statue near Krishna Sayer | 330000.00 |
13 | High Mast Light near D.M. Bungalow, Ward No. 4, under the Burdwan Municipality | 330000.00 |
14 | High Mast Light at Birhata More near BartamanBhavan on G.T. Road, under the Burdwan Municipality | 330000.00 |
15 | High Mast Light at Badsahi More, under the Burdwan Municipality | 330000.00 |
16 | High Mast Light at Baranilpur More, under the Burdwan Municipality | 330000.00 |
17 | High Mast Light at Purbasha Bus Stand, under the Burdwan Municipality | 330000.00 |
18 | High Mast Light at Pirtala Crossing (Chotonilpur), under the Burdwan Municipality | 330000.00 |
19 | High Mast Light at Vivekananda College More, under the Burdwan Municipality | 330000.00 |
20 | High Mast Light at D.M. Bungalow Area (on Kalna Road), under the Burdwan Municipality | 330000.00 |
21 | High Mast Light at Saraitikar More, Ward No. 1, under the Burdwan Municipality | 330000.00 |
22 | High Mast Light at Police Line Bazar, under the Burdwan Municipality | 330000.00 |
23 | High Mast Light at DVC More, under the Burdwan Municipality | 330000.00 |
24 | High Mast Light at Badamtala More, under the Burdwan Municipality | 330000.00 |
25 | High Mast Light at Parbirhata (on G.T. Road), under the Burdwan Municipality | 330000.00 |
26 | High Mast Light at Rajbari More, Borehat near Rabindra Statue under the Burdwan Municipality | 330000.00 |
Total | 8580000.00 |
TOTAL PROJECT COST FOR THE YEAR 2014 - 2015 :- | 161340529.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Construction of Concrete pavement
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete pavement from Hatchery Road to Sukanta Nagar main Road at Ward No. 11 under the Burdwan Municipality, Burdwan | 1598108.00 |
2 | Construction of Concrete Road at Sukantapally, Belkash G.P. under the Burdwan Planning Area, Burdwan | 3839010.00 |
3 | Construction of concrete Road from Purbapara to SishuSiksha Kendra at GimtiPhatak under the Saraitikar G.P, Burdwan-I Block | 1507049.00 |
4 | Construction of Concrete Road (including Pucca Drain) at Raynagar, under Baikunthapur - II G.P, Burdwan | 2088206.00 |
5 | Construction of concrete pavement from SantiparaMandirtala to Bhansa Para SSK School at Saraitikar, under the Burdwan Planing area, Burdwan | 3612347.00 |
6 | Construction of concrete road from JhapantalaMandir to JamunaPukur South east corner under the Saraitikar G.P., Burdwan-I Block | 877378.00 |
7 | Construction of concrete road from Purba Para to SishuSiksha Kendra at GimtiPhatak under the Saraitikar G.P., Burdwan. | 1552260.00 |
8 | Construction of concrete road (including pucca drain) at Raynagar under Baikunthapur-II G.P., Burdwan. | 2150852.00 |
9 | Construction of concrete road at Indrokanan, ward no.- 12 under Burdwan Municipality | 896188.00 |
10 | Construction of concrete road at Najrulpally, ward no. 13, under Burdwan Municipality. | 614205.00 |
11 | Construction of concrete road near DVC More (1. Municipal Concrete Road to Chanda Roy & 2. Municipal Concrete Road to SwaswatiDas's House) at ward no. 11, under Burdwan 52Municipality, Burdwan | 317333.00 |
12 | Construction of concrete pavement at AluDanga at ward no. 5 under Burdwan Municipality. | 1730762.00 |
13 | Construction of concrete pavement at BardhamaneswarAdibasi Area, (FCI godown to TilkaDiger's House), in ward no. 22 under Burdwan Municipality. | 498872.00 |
Total | 21282570.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bituminous Road at Netaji Nagar, Burdwan. | 2052408.00 |
2 | Construction of Bituminous Road at ShibpurDighir Par, Burdwan | 6407931.00 |
3 | Construction of Bituminous road from Rayan School More to the end of Rayan village under the Burdwan Planning area, Burdwan. | 2810539.00 |
4 | Construction of Bituminous Road at Malirbagan (Under Rayan- I G.P.), under the Burdwan Planning Area, Burdwan | 1451877.00 |
5 | Construcition of Bituminous road from Goda to G.T. Road at ward no.- 26 under Burdwan Municipality, Burdwan. | 1843027.00 |
6 | Construction of Bituminous Road at Jhinguti from SuriRaod to NH-2 under Belkash G.P., Burdwan. | 4069563.00 |
7 | Construction of Bituminous road from Khanpukur Co-Op-Bank More to Rayan High School via Sukantapally, Nari, (from 0.000 km to 3.078 km) under the Burdwan Planning Area, Burdwan. | 7393804.00 |
8 | Construction of Bituminous road from LakurdihiJalkol more to NH-2 (Via Church) at ward no.- 25, Burdwan. | 1752544.00 |
Total | 27781693.00 |
Construction of Clock Tower
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Clock Tower, near Banka Bridge, on G.T.Road under Burdwan Planning area, Burdwan | 5867000.00 |
Total | 5867000.00 |
Construction of Childrens' Park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Childrens' Park at Ward No. 8 | 358325.00 |
2 | Construction of Childrens' Park at Ward No. 13 | 410152.00 |
3 | Renovation of Childrens' Park near PadmashreeSangha at Ward No. 10 under Burdwan Municipality, Burdwan | 220724.00 |
4 | Renovation of park named "RabindraSishuUddan" (2nd phase) at 2 No. Sankharipukur, ward no. 15 under Burdwan Municipality, Burdwan. | 450018.00 |
Total | 1439219.00 |
Senior Citizens Parks (Abasarika)
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construciton of Park named "Abasarika" (phase-I) at UtsavMaidan, Birhata | 4477654.00 |
2 | Construction of Park named Abasarika (Phase - II) at UtsavMaidan, Birhata under Burdwan Planning Area, Burdwan (to be sent to U.D.D) | 2215338.00 |
Total | 6692992.00 |
Beautification of Ponds
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Beautification of pond at officer's Colony under ward no. 10 | 449627.00 |
2 | Beautification of pond at Kantapukur ward no. 1 | 186517.00 |
Total | 636144.00 |
Illumination Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Supplying, fitting and fixing of sodium vapour light along the sides of Burdwan - Katwa Road from Burdwan I.P.S to Kshetia G.P. within the Burdwan Planning Area, Burdwan | 430998.00 |
Total | 430998.00 |
Construction of Guard Walls
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Guard Walls (both sides) from Kanchan Nagar Chanditala to Idilpur DVC Bandh (From 0.000 k.m to 0.430 k.m) under Burdwan Planning Area, Burdwan | 689912.00 |
Total | 689912.00 |
Construction of Shed at Khakkorbaba (Rahamattulla) at MazarSahrif
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Shed at Khakkorbaba (Rahamattulla) at MazarSahrif under under Burdwan Planning Area, Burdwan. | 948502.00 |
Total | 948502.00 |
Construction Pucca Drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction Pucca Drain at Mohan Bag Saradapally, Tejganj under Burdwan Planning Area, Burdwan | 6139841.00 |
Total | 6139841.00 |
Repairing and Rehabilitation of Bridge
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Repairing, Rehabilitation and Strengthening of Banka Bridge at Birhata, under Burdwan Municipality, Burdwan. | 4788928.00 |
Total | 4788928.00 |
Deposit Work
Renovation of Rabindra Bhavan
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of RabindraBhavan at Borehat, Burdwan. | 3938559.00 |
Total | 3938559.00 |
Besides, being the Executing Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Illumination Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | High Mast Light (with LED) at Nababhat More crossing, Ward No. 26, under the Burdwan Municipality, Burdwan | 387000.00 |
2 | High Mast Light (with LED) near BramhaKumari Ashram, Ward No. 6, under the Burdwan Municipality, Burdwan | 387000.00 |
3 | High Mast Light (with LED) at Burdwan Circuit House, Ward No. 6, under the Burdwan Municipality, Burdwan | 387000.00 |
4 | High Mast Light (with LED) near Mohanbagan Math, Ward No.26, under the Burdwan Municipality, Burdwan | 387000.00 |
5 | Supplying fitting fixing 3 nos Sodium Vapour light at Ma KhatamanJahuraMazar (before Nurse Quarters) at Ward No.- 29 | 150714.00 |
6 | Illumination by 2 no. of double bracket poles (LED) at Kalibazarbanka bridge junction, ward no. 8 & 9 under Burdwan Municipality, Burdwan | 180250.00 |
7 | Illumination by 2 no. of double bracket poles (LED) at Power House More, ward no. 2 under Burdwan Municipality. | 180250.00 |
8 | Illumination by 2 no. of double bracket poles (LED) at Dighirpool, ward no. 21, under Burdwan Municipality | 180250.00 |
9 | Illumination by 2 no. of double bracket poles (LED) at South Gate of Burdwan University, Golapbag, Burdwan. | 180250.00 |
10 | Supplying fitting, fixing 16 mt. height high mast tower at Burdwan Collectorate Complex, Court Compound, Burdwan. | 486316.00 |
11 | Supplying fitting, fixing (including irrection) 7.50 mt. high single bracket tower with LED inside the campus SSW (Anamoy) Hospital, under Baikunthapur II G.P., Burdwan. | 215137.00 |
12 | Supplying fitting and fixing (including errection) 4 nos. of 12.5 mtrs height High Mast Tower with LED at i) on the road near BidyarthiBhavan girl's High School ward no.- 35, ii) the place near Vivekananda Statue Telmarui Road junction ward no.- 33&34. Iii) Radharani Stadium ward no.- 35 iv) a place near miarBer, Kalna Gate at ward no.-8. | 1391002.00 |
13 | Supplying fitting and fixing (including errection) 4 nos of 12.5 mtrs height high mast tower with LED at i) Kazir hat Battala (Goda) ward no. 26, ii) a place in front of Nutanganj Police out post, ward no. 22, iii) a place near borehatkalitala behind Abhaykanan of Burdwan University ward no. 28 iv) Karbala (Kabarsthan) ward no. 23. | 1391002.00 |
Total | 5903171.00 |
Renovation work at Burdwan Mukta Mancha
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation work at Burdwan Mukta Mancha at ward no. -7 under the Burdwan Municipality, Burdwan | 702534.00 |
Total | 702534.00 |
Construction of Ladies Parks
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Park for women named "BandeMataram" at ward no. 26. | 1130615.00 |
2 | Construction of park for women named "BandeMataram" at ward no. 21 | 1520000.00 |
Total | 2650615.00 |
Construction & Development of Playground
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bidyasundar Math, at Ward No. 19, within the Burdwan Municipal Area, Burdwan | 1177513.00 |
Total | 1177513.00 |
PROJECT COST FOR THE YEAR 2015 - 2016 :- | 91070191.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Construction of Concrete Pavement
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete pavement including guar wall at Malik Pukur, Tejganj under ward No. 17 Burdwan Minicipality. | 1216000.00 |
Total | 1216000.00 |
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete road from Purbapar to Sishu Sikha Kendra at Gimti Fatak under Saraitikar G.P Burdwan. | 1142000.00 |
2 | Construction of concrete road form Bidhanpally Purba Math road to Sudhanya Koner House under Ward No. 11 of Burdwan Municipality. | 1699000.00 |
3 | Construction of concrete road from at Harinarayanpur Bidyasagar Plly at Saraitikar G.P. under Burdwan Planning area, Burdwan. | 1374000.00 |
4 | Construction of concrete road at Pranobandan Samobay Griho Niram Pally at Rayan I G.P. under Burdwan Planning Area, Burdwan. | 2124000.00 |
5 | Construction of concrete road from Rinmath to Garia Pukur at Village Kamnara. | 997102.00 |
6 | Construction of concrete road from Himani Bag House to Ganapati Bag house via Adibasipara at village Kamnara. | 999644.00 |
7 | Construction of concrete road at Goda Daspara (Simultala Math) under Ward No 26, Burdwan Minicipality. | 1020000.00 |
8 | Consolidation of Earthen road with Concrete dhalai from Puja House at Narayandighi I village, under Rayan I G.P. Burdwan | 750000.00 |
9 | Consolidation of Earthen road with Concrete dhalai Kopibagan from Main road at Nari village, under Rayan I G.P. Burdwan | 750000.00 |
Total | 10855746.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bituminous raod from Saraitikar to Chandel (2nd phase) under Burdwan Planning Area, Burdwan. (Length -1000m) | 3530000.00 |
2 | Construction of Bituminous road at Krishnapur Village from High School to Sishu Siksha Kendra under Burdwan Planning Area, Burdwan | 3812000.00 |
3 | Construction of Bituminous road from Sishumandir to Olaichandital and other by lane sunder Ward No. 11 Burdwan Municipality. | 2880000.00 |
4 | Construction of Bituminous road from Prakash Ghosh's house to Jamuna Dhar's House via Kalitala Para, Dakshin Para, Majher Para at Malkita Village at Kshetial G.P under Burdwan Planning Area , Burdwan. | 1817000.00 |
5 | Construction of Bituminous road from Katwa Road to Mirzapur Nazurl Mancha at Nadanghat Road under Saraitikar G.P under Burdwan Planning Area. | 3285000.00 |
6 | Construction of Bituminous road from Talit Dighir par to new Primary Schgool under Bagher II G.P. under Burdwan Planning Area. | 1432000.00 |
7 | Construction of Bituminous road from Mizapur Passenger shed to Mizapur bandha ghat via Hazra Para & Samantapur under Saraitkr G.P. under Burdwan Planning Area. | 1310000.00 |
8 | Construction of Bituminous road from Ranisayanr More to Chand's Tea Ship via Das Para, under Saraitikar G.P. under Burdwan Planning Area. | 3363000.00 |
9 | Construction of Bituminous road from Das Para to Rain Gate No. 52 under Daraitikar G.P. under Burdwan Planning Area. | 2204000.00 |
10 | Construction of Bituminous road from Pamra to Jhapantala via Setia Oil Mill at Baikunthapur I & II G.P. under Burdwan Planning Area. | 4407000.00 |
11 | Construction of Bituminous road from Camri Hospital to NH-2 via Swasti Pally More under Burdwan Planning Area. | 1944000.00 |
12 | Construction of Bituminous road from Bamun Pukur Para Health Centre to Ghating Gora ICDS under Rayan G.P. | 3441000.00 |
13 | Construction of Bituminous road (with Drain) from Sastitala More to NH-2 via Sile Para Under Baikunthapur - I G.P. | 1405000.00 |
14 | Construction of Bituminous road after earthen consolidatiuon from Primary School to Salam House at Chalknal under Belkash G.P Burdwan I | 498900.00 |
15 | Construction of Bituminous road fafter earthen consolidation from Diura SSK to Kamnara main road at Sansad No XXIII | 1529352.00 |
Total | 36858252.00 |
Development of Mandela Park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Development of Mandela Park including provision of parking area near Bijoy Toran ,G.T Road Burdwan. | 62254000.00 |
Total | 62254000.00 |
Construction of Wheel Gurad to footpath
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Wheel Gurad to footpath of old Bank Bridge at Alamgaunge within Burdwan Municipality, Burdwan | 410000.00 |
Total | 410000.00 |
Renovation and Construction of Work
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation and Construction of Works at BDA Guest House, Burdwan | 13256319.00 |
Total | 13256319.00 |
Illumination Schemes
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Illuminsation of High Mast Light at Nilpur and Its sorrounding areas covering Ward No. 7,12,13,14 under Burdwan Municipality. | 3816000.00 |
2 | Illuminsation of High Mast Light Kanchannagar and its Sorrounding Under Burdwan Municipalilty. | 3816000.00 |
3 | Supply, fitting & Fixing Sodium Vapour Light along the side of Burdwan Katwa Road from Burdwan I Panchayat Samity to Kashetia Gram Panchayat with in Burdwan Planning Area, Burdwan. | 447000.00 |
Total | 8079000.00 |
Construction of Pay & Use toilet
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Pay and Use toilet at Sarbamangala Mandir under Ward No. 20 Burdwan Municipality. | 1431000.00 |
Total | 1431000.00 |
Construction Pucca Drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Pucca Drain from Kamal TT house to Mihir house at Narayandighi Village under Rayan I G.P. Burdwan | 750000.00 |
2 | Pucca Drain at Adibari Para from main road at Nari Village under Rayan I G.P. Burdwan | 750000.00 |
3 | Pucca Drain from Hari Roay at Alim House via School math at Kantia Village under Rayn I G.P. Burdwan | 750000.00 |
Total | 2250000.00 |
Deposit Work
Renovation of Burdwan Mukta Manch
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of Burdwan Mukta Mancvha at Ward No 7 under Burdwan Municipality, Burdwan | 681000.00 |
Total | 681000.00 |
Besides, being the Executing Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Construction of concrete Road with drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete road with drain at Sukantapally, Burdwan | 291283.00 |
2 | Construction of concrete road with drain at Sukantapally, Burdwan | 377773.00 |
Total | 669056.00 |
Construction of drain
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of pucca at ward no. 1 under B.M. | 244760.00 |
Total | 244760.00 |
Illumination Work
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | High Mast Light at Tarun Sangha Play Ground, Borehat, Burdwan | 381604.00 |
Total | 381604.00 |
Reparing Work
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Reparing work at Burdwan Vivekanda Balika Bidyalay, ward no. 8. | 195800.00 |
Total | 195800.00 |
Construction of concrete road including Guard wall
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete road including guard wall at ward no. 3 under Burdwan Municipality. | 268971.00 |
2 | Construction of concrete road including guard wall at ward no.13 under Burdwan Municipality. | 773440.00 |
3 | Construction of concrete road including drain in ward no. 7 under Burdwan Municipality. | 232903.00 |
Total | 268971.00 |
Construction of concrete road including Guard wall
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Additional work at the Ladies Park "Bandamataram" under ward no. 21. | 484387.00 |
Total | 484387.00 |
Development of Kabarsthan
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Development of Kabarsthan at the South Side of Meen Bhavan at ward no. 27, under B.M. | 662119.00 |
2 | Development of Kabarsthan at Kamal Sayar at ward no. 26, under B.M. | 662119.00 |
Total | 1324238.00 |
PROJECT COST FOR THE YEAR 2016-2017 :- | 140860133.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Construction of Concrete Pavement
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete pavement from DVC Bridge to Udaypally Bazer at Kanchannagar under Ward No. 24 of Burdwan Minicipality. | 3534000.00 |
Total | 3534000.00 |
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete road at Bidhan Palli Kathmistry para under Ward No 11 Burdwan Municipality. | 1707210.00 |
Total | 1707210.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bitunous Road over moroum road form 5700 pul to Gobdhut pal at Milik Para | 14028000.00 |
2 | Construction of Bitumin Road (after consolidation of Earthen road )from Belkash to Nala 4 Kms. | 12204000.00 |
3 | Construction of Bituminous Road from Chandel SSK to Amar via Nutun Gram more and Sija pra of Saraitkar G.P. | 14668000.00 |
4 | Construction of Bituminous Road from Anjirbagan by pass more toirrigation Bunglow ward no 22,23 &24 under Burdwan Minicipality | 12771440.00 |
5 | Construction of Bituminous Road at Gopalnagar from Srimanta Atachaki to DVC road under Baikunthapur GP under Burdwan Planning Area. | 551442.00 |
6 | Construction of Bituminous Road from NH 2 to Pamra Village road via St Paul School at Baikunthapur II GP under Burdwan Planning Area, Burdwan | 1913130.00 |
7 | Construction of Bituminous Road at Udayan form G.T Road to DVC Branch Canel under Baikunthapur II GP | 1281370.00 |
8 | Construction of Bituminous Road from Saranya Hospital to Bam Masjidtala at Bam under Baikunthapur I G.P under Burdwan Planning Area, Burdwan. | 1353420.00 |
9 | Construction of CCof both side flank of Bituminous road from Udaypally Bazar mor up to irrigation Bundh(Panchayat Area) | 4306000.00 |
Total | 63076802.00 |
Development of Park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Children Park at Hat Baikunthapur | 610000.00 |
Total | 610000.00 |
Beautifiction Project
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Beautification project at Birhata, Burdwan | 52336736.00 |
Total | 52336736.00 |
Renovation and Repair Works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation Buring Ghat at Kanchanagar Malipara in Ward No 24 | 1886000.00 |
2 | Renovation including Colour wash distemper painting varnishing of auditorium of Children Complex at Kalpataru Math (West Bengal State Age Group Champion Ship From 8th to 11th June) | 998000.00 |
3 | Repair to the RCC bridge over river Banka at Rainagar within Baikunthapur II in P.S Burdwan under Palla i0 Section of Edilpur ii) sub-divn within Damodar Canal Divisini during the year 2017-18 | 461680.00 |
4 | Renovation & repairing of Rathghar (2 nos) at Rathtala in Ward No 23 under Burdwan Minicipality. | 2179130.00 |
Total | 5524810.00 |
Construction of Ghat
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of bathing Ghat over left bank of River Banka near Surya mandir D/S of Katherpul (Akhilesh Setu) in ward no 34 of Burdwan Minicipality. | 2593278.00 |
2 | Construction of Ghat at Rainnagar Bridge over river Banka within Baikunthapur GP II in P.S Burdwan Dist Burdwan under Palla i) Section Edilpur ii)sub-divn within Damodar Cannal Divisioni During the year 2017-2018 | 301510.00 |
Total | 2894788.00 |
Development of works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Development of Roynagar Road from Raynagar Rail Bridge to Raynagar Banka Bridge under Baikunthapur II GP | 1179000.00 |
2 | Improvement of road side flank by Cement concrete of maneswertala to Lichu bagan Road in Ward No. | 3572189.00 |
Total | 4751189.00 |
Construction Boundary Wall & Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Boundary wall installation of iron grill and other allied work at children park ward no 13 | 658000.00 |
2 | Construction of Road from Golapbag to Mini Zoo Burdwan. | 1042200.00 |
Total | 1700200.00 |
Besides, being the Executing Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Construction & Renovation of Class Room and Bundar Wall of different school
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Class Room of Municipal Boys High School | 1294072.00 |
2 | Renovation of class room of Bharati Balika Bidyala | 534000.00 |
3 | Reparing and Colouring work of Burdwan Vivekananda Balida Bidyala | 141007.00 |
4 | Reparing and renovation of existing school building of Burdwan Shib Kr. Harijan Bidyala | 500000.00 |
5 | Repair and renovation of existing school building of Saradapith Urban Junior Basik School at Borehat. | 594414.00 |
6 | Repair and renovation of existing school building of Burdwan Burdwan Banipith High School, Kalna Gate Branch, Burdwan. | 300000.00 |
7 | Construction of concrete floor and drain at Burdwan Banipith Girls High School, Becharhat, Burdwan. | 397684.00 |
8 | Construction of Boundary Wall at Rathtalla G.S.F.P. Bidyala, Kanchannagar, Burdwan. | 264752.00 |
9 | Construction of boundar wall at Rathtala Adarsha Prathamik Bidyala, Burdwan | 287578.00 |
10 | Construciton of boundar with chain link at the side of play ground at Bidyarthi Bhavan Boys High School, Pirbirhat, Burdwan. | 200000.00 |
Total | 4513507.00 |
PROJECT COST FOR THE YEAR 2017-2018 :- | 140649242.00 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of cement concrete road, drain & Culvert at Nibeditapally under Burdwan Samity I, Saraitikar Panchayat , Mouza- Jotgoda & Belkash | Rs. 3,133,380.00 |
2 | Construction of concrete road from Jotgoda Tala to Sudeb Nandi House at Rayan Village | Rs. 3,464,439.00 |
3 | Construction of Concrete road with pucca drain from Bibek Chatterjee House to Pradip Das House under Rayan I GP under Rayan I GP under Burdwan Planning Area. | Rs. 1,674,454.00 |
Total | Rs. 8,272,273.00 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Bituminous Road at Bijoyram Village from Bijoyram Bus Stand to Chakchake Kabarstan under Rayan I GP of Burdwan Planning Area,Burdwan . | Rs. 5,428,523.00 |
2 | Construction of Bituminous road from Thalassemia Hospital to Biswajit Dutta's House via Pronob Biswas's house at Baikunthapur I GP (Gosaipara) | Rs. 10,235,037.00 |
3 | Construction of Bituminous Road from NH2 to Carmel School under Baikunthapur II GP, Burdwan Planning Area. | Rs. 2,782,266.00 |
4 | Construction of Bituminous road from St. Xaviers Road to Balaji Housing Complex ward no 12 under Burdwan Municipality. | Rs. 564,300.00 |
5 | "Development and Beautification of Road from Golapbag More to Bidhan Roy Statue near Krishna Sayar park and Beautification of the Right Side of the Road including Jhill (Ditch) in the area of the Burdwan University at Golopbag Campus Part A- Civil work for Development and Beautification of Road" | Rs. 29,779,741.00 |
Total | Rs. 48,789,867.00 |
Development of Park
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Development of park at Olaichandital Mandir Complex at Ward no 11. Under Burdwan Municipality PART - B Development of Park and Pay & Use Toilet. | Rs. 3,066,468.00 |
Total | Rs. 3,066,468.00 |
Beautifiction Project
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | "Development of Park at Olai Chanditala Mandir Complex Ward No - 11 Part -A:- Development and beautification of pond and pathway at Olaichanditala mandir complex, ward no 11, under Burdwan Municipality." | Rs. 3,210,738.00 |
2 | Installation of Iron Grill , hedge , fencing , sitting arrangement and illumination at the both side of the main entrance of Anamoy Hospital at Baikunthapur II GP. | Rs. 1,799,494.00 |
3 | Re-excavation, beautificaiton and illumination of pond inside the Anamoy Hospital at Baikunthpaur II G.P. | Rs. 1,158,489.00 |
4 | Gardening and fencing of existing greenery inside and right side of Anamoy Hospital at Baikunthpur II GP. | Rs. 1,829,755.00 |
5 | Beautification of GT Road side pond in Police line, Purba Bardhaman. | Rs. 5,439,326.00 |
6 | Beutification of pond at Officer's colony (Phase-ii) under w.o. - 10 burdwan municipality | Rs. 707,053.00 |
7 | Beutificication of pond at Mallikpukur , w.n - 17, Burdwan municipality | Rs. 1,052,958.00 |
8 | Beautification of Garden in front of Sanskrit Lokomancha,Burdwan. | Rs. 495,661.69 |
9 | Beauitification (Plot Area 1000.00 sq-m ) at Kankaleswari Kalibari Ashram Parichalan Samiti Complex ,W.N- 24,Under Burdwan Municipality, Dist. -Burdwan. | Rs. 2,556,901.00 |
10 | Painting and colour works surrounding the area of Kanchannagar and Rathtala & Absarika Park under Burdwan Municipality. | Rs. 1,911,389.00 |
Total | Rs. 20,161,764.69 |
Renovation and Repair Works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of Children Park in Sadhanpur Government Housing Complex ,Burdwan Municipality. | Rs. 918,766.00 |
2 | Renovation and repairing of VVPAT godown at Nawabhat bus Stand, Burdwan | Rs. 30,554.00 |
Total | Rs. 949,320.00 |
Electrical Works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | "Development and Beautification of Road from Golapbag More to Bidhan Roy Statue near Krishna Sayar park and Beautification of the Right Side of the Road including Jhill (Ditch) in the area of the Burdwan University at Golopbag Campus Part-D Electrical Component " | Rs. 6,463,184.00 |
2 | Erection of decorative pole at Surja mandir Ghat at Banka river behind Bidyarthi Bhavan Girls High School under Ward No - 34 under Burdwan Municipality. | Rs. 148,638.00 |
3 | Erection of decorative light pole (Tri-phala) at Lichhu Bagan Road in Ward No . 24 under Burdwan Municipality. | Rs. 1,400,000.00 |
4 | "Erection of decorative pole at Kamal Sayer Kabarasthan under Ward No - 26 under Burdwan Municipality. (2nd Call)" | Rs. 664,300.00 |
5 | Dismantling and Re- installation of the existing 12.5 mtr. height High Mast Tower at various site | Rs. 2,562,359.00 |
6 | Beautification and illumination works, including installation of 'Biswa Bangla' globe, in and around Abasarika Park and oldage home at Kanchannagar | Rs. 4,380,000.00 |
Total | Rs. 15,618,481.00 |
Development of works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | The Chain link fencing surrounding the Officers colony pond, under Word No-11, Burdwan Municipality | Rs. 1,189,737.00 |
2 | Construction of Change room Near Bathing Ghat (Surya Mandir) at Banka River | Rs. 387,403.00 |
3 | Flooring & railing work of the steps of the stair of Abasarika, Birhata, Burdwan | Rs. 424,466.00 |
4 | Development of land at C.E.O. Bungalow, under Burdwan Municipality, Burdwan. | Rs. 56,171.00 |
5 | Civil works for Development of land, gardening, gazebo and drainge system at D.M. Bungalow, Purba Bardhaman. (Phase - II) | Rs. 2,145,916.00 |
6 | Civil works for Development of land, Road, and drainage system at DM Bungalow, Purba Bardhaman (Phase -I) | Rs. 600,000.00 |
7 | Civil works for Development of land, Road, and drainage system at DM Bungalow, Purba Bardhaman (Phase -III) | Rs. 529,636.00 |
8 | Grass turfing and hedging at D.M. Bungalow, Purba Bardhaman. (Phase I) | Rs. 478,304.00 |
9 | Grass turfing and hedging at D.M. Bungalow, Purba Bardhaman. (Phase II) | Rs. 347,689.00 |
Total | Rs. 6,159,322.00 |
Besides, being the Executing Agency, the BDA had executed the following scheme in the planning area of the BDA under BEUP for 260 Bardhaman Dakshin A.C.
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Mural, Artifical Grass , Cladding Stone Tiles and other decorative work at Multilevel Parking space near Curzon Gate. PART-A- Civil Works. | Rs. 1,985,754.00 |
2 | Mural, Artifical Grass , Cladding Stone Tiles and other decorative work at Multilevel Parking space near Curzon Gate. PART - B - Electrical Works. | Rs. 820,105.00 |
3 | Fitting and fixing of radium boards at the sites of the new schemes so executed under BEUP for 260-Bardhaman Dakshin Assembly Constituency | Rs. 104,412.00 |
4 | Writing and fixing of Radium Boards at the poles of High Mast Lights. | Rs. 268,488.00 |
5 | Mural, Artifical Grass , Cladding Stone Tiles and other decorative work at Multilevel Parking space near Curzon Gate. Part - C Fibre Glass Mural. | Rs. 1,696,664.00 |
6 | Beautification of Kamalsayar Kabarsthan, Burdwan at Ward No. 26 under Burdwan Municipality. | Rs. 388,275.00 |
7 | Construction of park at Ward No 27 under Burdwan Municipality. | Rs. 428,954.00 |
8 | Construction of concrete road at Kamalsayer Kabarsthan under Ward No. 26 under Burdwan Municipality | Rs. 465,817.00 |
9 | Construction of concrete road with Guard wall at North side of Samanta Pukur under Ward No. - 9 under Burdwan Municipality. | Rs. 337,744.00 |
Total | Rs. 6,496,213.00 |
PROJECT COST FOR THE YEAR 2018-2019 :- | Rs. 109,513,708.69 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Beautifiction Project
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | EPDM flooring 25mm in front of Oldage Home at Kankaleswari Kalibari, Kanchannager, Burdwan. | Rs. 4,819,511.28 |
2 | Interior renovation work for Chamber of Chairman at BDA Office, Burdwan. | Rs. 494,908.20 |
3 | Interior renovation work for Chamber of CEO at BDA Office, Burdwan. | Rs. 496,555.50 |
4 | Extension, fencing and beautification of the park at Absarika at Parbirhata in front of the Municipality toilet, Phase - II. | Rs. 190,062.00 |
5 | Erection of triphola from Udaypally to Khagreshwar under Ward No. – 24 Belkash GP Burdwan. (2nd Call). | Rs. 2,209,694.44 |
6 | Electrical works at Abasarika Park, Step Garden inside Utsab Maidan and BDA Clock Tower at Birhata, Burdwan. | Rs. 440,410.00 |
7 | Wall Painting on subject related Wild life seen at the Bardhaman Zoological Park boundary wall from South Gate to North Gate of the University of Burdwan at Golapbagh . | Rs. 422,400.00 |
8 | Temporary lighting arrangement and other ancillary works at Mandela Park. | Rs. 278,880.00 |
9 | Supply, planting and gardening at CEO BDA Bungalow. | Rs. 54,175.00 |
10 | Interior renovation work for Chamber of Chairman and CEO's Chamber at BDA Office, Burdwan (Electrical Work). | Rs. 353,543.00 |
11 | Planting of duranta at Abasarika Park UtsabMaidanBirgata, Burdwan. | Rs. 33,868.00 |
12 | Earth work in filling in front of BDA Clock Tower. | Rs. 97,416.00 |
13 | Fencing work of area surrounding BDA Clock Tower. | Rs. 105,408.00 |
14 | Illumination by decorative lighting pole and 12.5 mts. Height high mast at kankaleswari Kalibari field and Bidhyashram at Kanchannagar Ward No. 24, Burdwan Municipality. | Rs. 824,209.00 |
15 | Painting work surrounding Kanchannagar Abasarika Park and out side Kanchannagar Area, under Burdwan Municipality. | Rs. 411,643.00 |
16 | Interior finishing work of Anti-room CEO’s Office Complex at BDA Office, Burdwan. | Rs. 487,082.00 |
17 | Supply, fitting and fixing of artificial grass at Mandela Park. | Rs. 190,400.00 |
18 | Wall Painting on subject related Wild life seen at the Bardhaman Zoological Park boundary wall from South Gate to North Gate of the University of Burdwan at Golapbagh . | Rs. 499,500.00 |
19 | Cement plaster mural work with painting on external wall surface of Utsab Maidan Pay & Use Toilet. | Rs. 109,200.00 |
20 | Extension fencing and beautification of the park at Abasarika at Parbirhata in front of the Municipality toilet, Phase III. | Rs. 242,132.00 |
21 | Supply, fitting and fixing of LED lights at BDA Office. | Rs. 43,568.00 |
22 | Grass Carpeting and hedging around Badminton Court at DM Bungalow Burdwan. | Rs. 130,716.00 |
23 | Paninting works and other ancillary works at BDA Office Premises. | Rs. 214,738.00 |
24 | Overal beautification of BDA Guest House Campus under Burdwan Municipality. | Rs. 1,143,410.54 |
25 | Electrical works Pay & Use Toilet at Utsab Maidan. | Rs. 276,748.00 |
Total | Rs. 14,570,177.96 |
Construction of Bituminous Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of bituminous road at Kamalsayer Mohalla, Ward No. - 26 under Burdwan Municipality. | Rs. 1,821,075.00 |
Total | Rs. 1,821,075.00 |
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of concrete road with pucca drain at Sukanta palli (B) Chandi Mondal’s house to Bimal Mondal’s house. | Rs. 498,302.00 |
Total | Rs. 498,302.00 |
Construction of Pay & Use Toilet
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Pay & Use Toilet at Utsab Maidan, Burdwan. | Rs. 2,472,685.07 |
Total | Rs. 2,472,685.07 |
Development works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Barrier in front of Mandela Park (near Carzon Gate) and Electrical room, under Burdwan Municipality. | Rs. 492,328.00 |
2 | Supply, Repair, Replacement, Testing and Commissioning of various components of BDA lift at Collectorate Building, Purba Burdwan. | Rs. 330,400.00 |
3 | Construction of Lift well and ancillary work surrounding BDA Guest House, under Burdwan Municipality. | Rs. 497,175.00 |
4 | Construction of urinal at Abasarika, Burdwan. | Rs. 172,556.74 |
5 | Proposed partition work in BDA Office. | Rs. 79,549.00 |
6 | Supply, installation, testing and commissioning of Submersible Pump motor set at BDA office. | Rs. 89,600.00 |
7 | Supply, fitting & fixing of different types of furniture at BDA guest House, Burdwan. | Rs. 424,956.00 |
8 | Supply, fitting & fixing of different types of furniture at BDA guest House, Burdwan. | Rs. 229,015.00 |
9 | Supply and installation of Air Conditioner at BDA Office. | Rs. 126,000.00 |
10 | Supply and installation of Air Conditioner in Chairman, ATP and AE Chamber at BDA Office. | Rs. 249,250.00 |
11 | Supplying and installation of Air Conditioner inside Chairman’s and CEO’s room at BDA Guest House. | Rs. 199,000.00 |
12 | Waterproofing treatment basement at BDA Guest House, Burdwan, (2nd Call). | Rs. 481,000.00 |
13 | Partition work at MED Office. | Rs. 49,500.00 |
14 | Renovation of BDA Guest house with strengthening of boundary wall and other ancillary works surrounding BDA Guest house under Burdwan Municipality. | Rs. 482,734.00 |
15 | Development of Cricket pitch & other ancillary works at Spandan Complex under Burdwan Municipality. | Rs. 268,003.00 |
16 | Renovation of Children’s Park in SadhanpurGovement Housing Complex, Burdwan Municipality. (Phase – 2). | Rs. 415,210.00 |
17 | Construction of pathway and other ancillary worksinfront of Mandela Park. | Rs. 300,858.00 |
18 | Construction of DG shed in BDA Guest House, Burdwan. | Rs. 172,059.00 |
19 | Allied works for the scheme name Construction of Pay & Use toilet at Utsab Maidan, Burdwan. | Rs. 424,345.00 |
20 | Supply fitting and fixing of various civil items in BDA Guest House. | Rs. 238,090.00 |
21 | Supply of various items at BDA office. | Rs. 370,800.54 |
22 | Supply of various bedding items at BDA Guest House. | Rs. 125,549.00 |
23 | Supply of home décor items at Guest House. | Rs. 193,318.00 |
24 | Construction of Badminton Court at D.M. Bunglow, Burdwan. | Rs. 498,144.54 |
25 | Removal of Rubbish, Garbage and other filthy materials from DM Bunglow and Circuit House. | Rs. 80,500.00 |
26 | Strengthing of basement floor at BDA guest house, Burdwan. | Rs. 192,672.00 |
27 | Repair and renovation of Golapbag Toilet under Burdwan Municipality. | Rs. 282,122.00 |
28 | Construction of toilet at CEO Bunglaow under Burdwan Municipality. | Rs. 163,093.00 |
29 | Construction of pump house near ADM ZP projects under Burdwan Municipality. | Rs. 375,495.00 |
Total | Rs. 8,003,321.74 |
PROJECT COST FOR THE YEAR 2019-2020 :- | Rs. 27,365,561.77 |
---|
Fund Sanctioned from Urban Development Department, Government of West Bengal & BDA's own fund
Beautifiction Project
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Renovation of BDA Meeting Hall and other ancillary works at AE’s Room. | Rs. 163,000.28 |
2 | Repairing and renovation of water pump line and other ancillary works in the BDA Guest House. | Rs. 320,700.20 |
3 | Installation of iron grill at the back side of BDA Clock Tower near Birhata Bridge, Burdwan. | Rs. 169,551.50 |
4 | Construction of statue stand at Meghnad saha planetorium under Burdwan Municipality. | Rs. 534,320.34 |
5 | Partition work & rendering the false celling at BDA Office | Rs. 62,522.00 |
6 | Remodeling and other ancillary works of Bathroom under BDA Office. | Rs. 128,110.00 |
7 | Supplying fitting & steel letter heads on ACP Board Office, Burdwan. | Rs. 55,561.00 |
8 | Colouring works of AEO's Chamber, EE's Chamber , corridor and flooring works beside Survey Section under BDA Office. | Rs. 58,760.00 |
9 | Landscaping and beautification work from Adm ZP Bungalow to Circuit House beside Kalna Raod under Burdwan. | Rs. 436,370.00 |
10 | Landscaping and beautification work surrounding BDA Clock tower, Burdwan. | Rs. 495,000.00 |
11 | Construction of Guard wall iron grill surrounding BDA Clock Tower, near Birhat Bridge Burdwan. | Rs. 633,272.75 |
12 | Supplying, fitting & fixing Steel double plated (welded back to back) name plate (both side printed) fitted with steel pipe & chain in front of the chambers of Hon’ble Chairman and CEO in BDA Office, Burdwan. | Rs. 19,860.00 |
13 | Temporary Arrangement for lighting during Durga Puja and Depawali festivals” at following places:A. Abasarika at Parbirhata B. Clock Tower C. Clock at Rajbati D. BDA Guest House. | Rs. 77,600.00 |
Total | Rs. 3,154,627.09 |
Construction of Concrete Road
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Construction of Concrete Road with drain at kesabganj Chati near FP school under Belkash Gram Panchayat. | Rs. 857,273.00 |
Total | Rs. 857,273.00 |
Development works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Supply and installation of sound system and other ancillary works at BDA Conference Room. | Rs. 145,000.00 |
2 | Construction of pathway and other ancillary works inside the DM Bungalow under Burdwan Municipality. (Phase I). | Rs. 102,257.00 |
3 | Construction of pathway and other ancillary works inside the DM Bungalow under Burdwan Municipality. (Phase II). | Rs. 277,867.00 |
4 | Protection with railing and other ancillary work in front of ADM (G) Bungalow in Kalna Road under Burdwan Municipality. | Rs. 489,448.00 |
5 | Installation of water pump and sanitary fixtures in urinal block at Ranisayar (North) under Ward No . 30 of Burdwan Municipality. | Rs. 154,057.00 |
6 | Construction of Dressing Room at Radha Rani Stadium under Burdwan Municipality. (2nd Call). | Rs. 1,639,339.98 |
7 | Installattion of Glow sing board at BDA Guest House and Sadhanpur Housing. | Rs. 35,675.00 |
8 | Supply of bedding items and other materials for official purpose at BDA Guest House and BDA Office. | Rs. 310,200.00 |
9 | Construction of roof shed in CEO Bungalow under Burdwan Municipality. | Rs. 30,101.00 |
10 | Cabinets and computer tables in BDA Office Burdwan. | Rs. 456,695.00 |
11 | Supply various materials in BDA Guest House and Conference Hall. | Rs. 394,300.00 |
Total | Rs. 4,034,939.98 |
Electric works
Sl. No. | List of schemes executed | Project Cost |
---|---|---|
1 | Electrical works at Circuit House, Children Park at Sadhanpur Housing and Left side of ADM ZP Bungalow. | Rs. 445,797.00 |
2 | Electrical works at BDA Guest House. | Rs. 163,289.00 |
3 | Electrical works at BDA Conference. | Rs. 33,318.00 |
4 | Electrical works at ADM ZP Bungalow to Sadhanpur Housing Main Gate including Pump Housing. | Rs. 436,612.00 |
5 | Supplying, fitting and fixing of recessed mounted LED Light at BDA Conference Room (2nd Call) | Rs. 103,900.00 |
6 | Electrical Work at BDA Guest House Groround Floor. | Rs. 63,129.00 |
7 | Repair of 5 numbers 12.5 mtr High Mast Tower at Police Lines, Burdwan. | Rs. 547,212.80 |
8 | Electrical works at AEO, EE, ATP, AE Chambers and Conference Room of BDA Office. | Rs. 69,261.00 |
9 | Electrical works at Second Floor of BDA Guest House. | Rs. 28,276.00 |
10 | Electrical works at Dressing Rooms at Radharani Stadium under Burdwan Municipality. | Rs. 291,357.00 |
11 | Illumination of Statues at Meghnad Saha Planetarium under Burdwan Municipality. | Rs. 32,857.00 |
12 | Illumination of garden at BDA Clock Tower. | Rs. 88,294.00 |
Total | Rs. 2,303,302.80 |
PROJECT COST FOR THE YEAR 2020-2021 (Upto December 2020) :- | Rs. 10,350,142.87 |
---|
Bardhaman Planning area, as delineated by Burdwan Development Authority (BDA) extends over 157.62 Sq. Km, accommodating about 4.07 lakh population. It is located in the south part of Bardhaman district, 107 Km north-west of Kolkata Metropolitan area (KMA). The Bardhaman Planning Area consists of Bardhaman Municipal Area and its adjoining villages located in five Gram Panchayats under Bardhaman I Panchayat Samity and two Gram Panchayats in Bardhaman II Panchayat Samity.